Curing Process
Demoulding takes place after 24 hours and curing of pipes is done for minimum 7 days by keeping pipes in water tank.Plastic wrapparing after casting vertical cast process.

Testing Facility
  • The most modern and scientific technique and process in testing are
    employed
  • Total 1 Hydraulic pressure testing machine 100 MM To 300 MM
    Capacity
  • Total 1 Hydraulic pressure
    testing machine350 MM To 2200 MM
    Capacity
  • Total 1 unit of load testing machine 100 MM To 300 MM Capacity
  • Total 1 unit of load testing machine 350 MM To 2200 MM Capacity
  • Total 1 Cube testing machine
  • Permeability Test
  • Straight Test Dimension Test

 